Yennora Distribution Centre – Rail Siding Pavement Upgrade
This project encompassed the complete removal of the existing container pavement adjacent and replacing with a segmental paver pavement. This also required cement stabilising the subgrade and installing a new concrete edge beam along the entire length of the rail siding.
BACK TO PROJECTS
Project Overview
Client:
Stockland
Role:
Project Manager
Status:
Completed 2007
Location:
Yennora, NSW